Movie: Ice core drilling at the Jungfraujoch (from the Paul Scherrer Institute)
March 2009
September 2003
March 2002
Two 3 Inch Ice Core Drills at base camp |
||
Two baseplates on the way to Illimani |
Two 3 Inch Ice Core Drills at Illimani |
|
View into the Ice Cap of Illimani |
Drillhead after contact to bedrock |
|
1998
Drill with Tent for Protection against sun, wind and snow (tent is a extra option). |
Drill with Shadow Sail |
Test of the surface sample drill in temperated ice. |
||
Ice core recovered from a ice cave in the Poor core quality due to a lot of stones in the ice. |
||
Erection at Lomosonovfonna (Svalbart) the 03/22/2009 Ambient temperature below -20°C Start time 16.10 |
03/22/2009 16.17
|
16.18 |
16.26 |
16.27 |
16.50 |
17.00 |
17.01 |
17.25 |
|
|
|
At the Jungfraujoch: | ||
|